This Change 1 to ER 11-1-321, 28 February 2005,
a. Corrects VE study applicability for total project cost from $2M to $1M, Paragraph 2.
b. Changes Paragraph 5. Definitions. Glossary inserted in Appendices replaces Appendix B.
c. Changes General Requirements to Authorities, Paragraph 6.
d. Changes Procedural Requirements to Guidance Structure, Paragraph 7.
e. Changes VE Workshops or Studies to Waivers, Paragraph 8.
e. Changes Staffing to Value Methodology (Standard), Paragraph 9.
f. Changes Roles and Responsibilities to Staffing, Paragraph 10.
g. Changes Training to Performance Measurement, Paragraph 11.
h. Changes Quality Assurance to VE Certification, Paragraph 12.
i. Changes VE Lessons Learned Tool to Point of Contact, Paragraph 13.
j. Deletes Selection of District VE Officer and OVEST Members, Paragraph 14.
k. Changed Appendix A. References.
l. Changed Appendix B. Definitions to Appendix B VE COP Strategic Plan Overview.
m. Changed Appendix C Sample Content of VE Plan and Work Breakdown Structure to Appendix C Scheduling Requirements for VE Studies.
n. Changed Appendix D Scheduling for VE Studies to Glossary.
o. Deleted Appendix E. Metrics. Refer to Annual Execution Guidance, EC or Letter from Commander.
p. Deleted Appendix F Sample Annual Guidance Plan, Value Engineering Program, North Atlantic Division, USACE. Refer to VE Manual of Practice.