Category Engineering | AskTOP.net – Leader Development for Army Professionals

Engineering

EM 1110-2-2704 Cathodic Protection Systems for Civil Works Structures

Purpose and Scope: This manual provides guidance for the selection, design, installation, operation, and maintenance of cathodic protection systems (CPSs) used to supplement paint systems for corrosion control on civil works hydraulic structures. It also discusses possible solutions to some …Read More

Article by

EM 1110-2-2703 Lock Gates and Operating Equipment

Purpose: This manual provides guidance in the structural, mechanical, and electrical design of lock gates and operating equipment at navigation projects.

Article by

EM 1110-2-2702 Design of Spillway Tainter Gates

Purpose: This manual provides guidance for the design, fabrication, and inspection of spillway tainter gates, trunnion girder, and trunnion girder anchorage for navigation and flood control projects. Load and resistance factor design (LRFD) criteria is specified for design of steel …Read More

Article by
Company Command: The Bottom Line - Army Leadership Guide
The Mentor - A Comprehensive Guide to Army Counseling and Leadership

EM 1110-2-2701 Vertical Lift Gates

Purpose: The purpose of this manual is to provide guidance in the structural design of vertical lift gates.

Article by

EM 1110-2-2611 Engineering for Prefabricated Constructuin of Navigation Projects

Purpose: This manual provides guidance to help Districts in developing innovative plans to use precast concrete segments and other prefabricated elements for construction of navigation projects. The primary emphasis is on describing engineering activities necessary during the project development process …Read More

Article by

EM 1110-2-2610 Lock and Dam Gate Operating and Control Systems

Purpose: This manual provides guidance for the mechanical and electrical design of navigation lock and spillway gate operating and control systems for both new construction and the rehabilitation of existing projects. Operation, maintenance and inspection information as it relates to …Read More

Article by
The comprehensive guide to the Military Decision Making Process (MDMP)
The Board Master - Army Promotion Board Study Guide

EM 1110-2-2610 Change 1

This change to EM 1110-2-2610, 12 December 2003, adds a new paragraph, 4.7 Onsite Wireless Remote to Chapter 4.

Article by

EM 1110-2-2608 Navigation Locks Fire Protection Provisions

Purpose: This manual sets forth design criteria and procedures to be used for fire protection systems at USACE navigation locks. The fire hazards addressed herein are those presented by commercial vessels, tows, and recreational craft. The protection to be provided …Read More

Article by

EM 1110-2-2607 Planning and Designs of Navigation Dams

Purpose: This manual is issued for guidance of individuals and elements within the Corps of Engineers engaged in the structural planning, layout, and design of navigation dams for civil works projects. The structural design of gates is not covered in …Read More

Article by

EM 1110-2-2602 Planning and Design of Navigation Locks

Purpose: This manual is issued for guidance of engineers and design offices within the Corps of Engineers engaged in the planning, engineering layout, analysis, and design of navigation locks for civil works navigation projects on inland waterways.

Article by

EM 1110-2-2504 Design of Sheet Pile Walls

Purpose: This manual provides information on foundation exploration and testing procedures, analysis techniques, allowable criteria, design procedures, and construction consideration for the selection, design, and installation of sheet pile walls. The guidance is based on the present state of the …Read More

Article by

EM 1110-2-2503 Design of Sheet File Cellular Structures Coffedams and Retaining Structure

Purpose: Provisions for the design of sheet pile cellular cofferdams are set forth in ER 1110-2-2901. This manual is intended to provide guidance for the design of these structures. Geotechnical considerations, analysis and design procedures, construction considerations, and instrumentation are …Read More

Article by