Category Engineering | AskTOP.net – Leader Development for Army Professionals

Engineering

EP 1110-1-3 Flood Tolerant Plant Species

Purpose: The purpose of this Pamphlet is to provide guidance in the identification of plant species capable of tolerating periodic or occasional flooding. CLICK TO DOWNLOAD

Article by

EP 1110-1-29 Lead Hazard Clearance Inspection – Standard Scope of Work

Purpose: This standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing site- and project-specific scopes of work for completion of lead hazard clearance inspections at Army target housing/child-occupied facilities that have undergone lead …Read More

Article by

EP 1110-1-28 Lead Hazard Risk Assessment for Target Housing Child-Occupied Facilities – Standard Scope of Work

Purpose: The standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides framework for developing site- and project-specific scopes of work for completion of lead hazard risk assessments at Army target housing, Family Child Care (FCC) homes, child …Read More

Article by
Award Quick: Army Award Writing Software
The Mentor - A Comprehensive Guide to Army Counseling and Leadership

EP 1110-1-27 Operation and Maintenance of Extraction and Injection Wells at HTRW Sites

Purpose: This engineer pamphlet transmits a document which describes requirements for carrying out Operations & Maintenance (O&M) for extraction and injection wells at HTRW sites. of this document contains logs and checklists to be used during O&M of extraction or …Read More

Article by

EP 1110-1-24 Establishing and Maintainng Institutional Conrols for Ordnance and Explosives oE Projects

Purpose: This pamphlet provides U.S. Army Corps of Engineers (USACE) personnel and their contractors with general guidance on the process to be used to develop, implement, and maintain institutional controls on Ordnance and Explosives (OE) projects sites.

Article by

EP 1110-1-24 Errata Sheet 1

ERRATA SHEET No. 1 Engineering and Design ESTABLISHING AND MAINTAINING INSTITUTIONAL CONTROLS FOR ORDNANCE AND EXPLOSIVES (OE) EP 1110-1-24 15 December 2000 Pending the next update to EP 1110-1-17, the included changes to the document are to be implemented.

Article by
The Mentor - A Comprehensive Guide to Army Counseling and Leadership
Army Counseling Software - Include over 250 Army Counseling Examples

EP 1110-1-22 Asbestos Surveys and Assessments – Standard Scope of Work

Purpose: The standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing site- and project-specific scopes of work for completion of asbestos surveys and assessments at Army facilities.

Article by

EP 1110-1-21 Air Pathway Analysis for the Design of Hazardous Toxic and Radioactive Waste HTRW Remedial Action Projects

Purpose: This Engineer Pamphlet describes Air Pathway Analysis (APA) procedures. These provide guidance for emission rate and dispersion modeling used to determine public health impacts of air emissions from HTRW remedial action projects. Using APA results in the design process …Read More

Article by

EP 1110-1-19 A Guide to Preparing and Reviewing Remedial Action Reports of Cost and Performance

Purpose: a. This pamphlet defines the procedures for formally documenting and reporting cost and performance information from U.S. Army Corps of Engineers (USACE) environmental restoration1 projects and provides guidance to the project team for scoping the types of data to …Read More

Article by

EP 1110-1-18 Ordnance and Explosives Response

Purpose: This pamphlet provides the U.S. Army Corps of Engineers (USACE) personnel with detailed procedures on the process to be used to manage and execute all aspects of ordnance and explosives (OE) response actions.

Article by

EP 1110-1-18 Errata Sheet 1

ERRATA SHEET No. 1 Engineering and Design MILITARY MUNITIONS RESPONSE PROCESS EP 1110-1-18 10 October 2005 Pending the next update to EP 1110-1-18, the following changes to the document are to be implemented. Wherever this document uses the term Military …Read More

Article by

EP 1110-1-17 Establishing a Temporary Open Burn and Open Dtonation Site for Conventional Ordance and Explosives Protects

Purpose: This pamphlet provides U.S. Army Corps of Engineers (USACE) personnel and their contractors with general guidance for establishing and utilizing a temporary Open Burn (OB) and/or Open Detonation (OD) site for the destruction of small quantities of Ordnance and …Read More

Article by