Mark Dail | AskTOP.net – Leader Development for Army Professionals

Author Archive

Here is a list of every post written by Mark Dail

EP 1110-1-9 Liquid Limit Grooving Tools

Purpose: The purpose of this pamphlet is to advise field offices of the availability and source of plastic liquid limit grooving tools, meeting Corps of Engineers specifications. CLICK TO DOWNLOAD

Article by

EP 1110-1-33 Spill Reporting Procedures for USACE Hazardous Toxic and Radioactive Waste Projects

Purpose: This pamphlet is intended to support: (i) the USACE policy for the prevention, control, reporting, and contingency planning for spills of oil and hazardous substances; and (ii) the USACE goal to use, generate, transport, store, handle, and dispose of …Read More

Article by

EP 1110-1-32 Electromagnetic Pulse EMP and Tempest Protection for Facilities

Purpose: This pamphlet provides information on the capabilities and potential uses of the Site Characterization and Analysis Penetrometer System (SCAPS) direct-push technology for the investigation of hazardous, toxic, and radioactive waste (HTRW) sites.

Article by
Military Writing: A Guide for Writing Counseling, Evaluations, Memos, Letters and more
Wear it Right! Army Uniform Tool

EP 1110-1-31 Combined Lead Inspection Risk Assessment for Target Housing Property Transfer – Standard Scope of Work

Purpose: The standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing site- and project-specific scope of work for completion of lead inspections/ risk assessments for DA property transfers.

Article by

EP 1110-1-30 Pre-Design Lead Abestos Survey – Standard Scope of Work

Purpose: The standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing project-specific scope of work to complete pre-design lead/asbestos surveys preliminary to DA project design.

Article by

EP 1110-1-3 Flood Tolerant Plant Species

Purpose: The purpose of this Pamphlet is to provide guidance in the identification of plant species capable of tolerating periodic or occasional flooding.

Article by
Visit MentorMilitary.com
The Board Master - Army Promotion Board Study Guide

EP 1110-1-29 Lead Hazard Clearance Inspection – Standard Scope of Work

Purpose: This standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing site- and project-specific scopes of work for completion of lead hazard clearance inspections at Army target housing/child-occupied facilities that have undergone lead …Read More

Article by

EP 1110-1-28 Lead Hazard Risk Assessment for Target Housing Child-Occupied Facilities – Standard Scope of Work

Purpose: The standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides framework for developing site- and project-specific scopes of work for completion of lead hazard risk assessments at Army target housing, Family Child Care (FCC) homes, child …Read More

Article by

EP 1110-1-27 Operation and Maintenance of Extraction and Injection Wells at HTRW Sites

Purpose: This engineer pamphlet transmits a document which describes requirements for carrying out Operations & Maintenance (O&M) for extraction and injection wells at HTRW sites. of this document contains logs and checklists to be used during O&M of extraction or …Read More

Article by

EP 1110-1-24 Establishing and Maintainng Institutional Conrols for Ordnance and Explosives oE Projects

Purpose: This pamphlet provides U.S. Army Corps of Engineers (USACE) personnel and their contractors with general guidance on the process to be used to develop, implement, and maintain institutional controls on Ordnance and Explosives (OE) projects sites.

Article by

EP 1110-1-24 Errata Sheet 1

ERRATA SHEET No. 1 Engineering and Design ESTABLISHING AND MAINTAINING INSTITUTIONAL CONTROLS FOR ORDNANCE AND EXPLOSIVES (OE) EP 1110-1-24 15 December 2000 Pending the next update to EP 1110-1-17, the included changes to the document are to be implemented.

Article by

EP 1110-1-22 Asbestos Surveys and Assessments – Standard Scope of Work

Purpose: The standard Scope of Work (SOW) described in this Engineer Pamphlet (EP) provides a framework for developing site- and project-specific scopes of work for completion of asbestos surveys and assessments at Army facilities.

Article by