ER 1110-2-8159 Life Cycle Design and Performance

Purpose:  This regulation defines engineering policies for selection of all systems, components, and materials for Civil Works projects, on the basis of their long-term performance. CLICK TO DOWNLOAD

Article by

ER 1110-2-8157 Responsibility for Hydraulic Steel Structures

Purpose: This regulation defines engineering responsibilities for design, construction, and operation of hydraulic steel structures.  ER 1110-2-100 requires periodic inspection of completed Civil Works Structures by Engineering Division personnel, but contains only general requirements applicable to all project features.  Specific …Read More

Article by

ER 1110-2-8156 Preparation of Water Control Manuals

Purpose:  The purpose of this regulation is to standardize the procedures to be followed in the preparation of water control manuals.

Article by
The Mentor - A Comprehensive Guide to Army Counseling and Leadership
Company Command: The Bottom Line - Army Leadership Guide

ER 1110-2-8155 Hydrometeorological Data Management and Archiving

Purpose: This regulation establishes policy and provides guidance and procedures applicable to the management and archiving of hydrometeorological data used for planning/project studies and project operations. It provides a recommended format for archiving data.

Article by

ER 1110-2-8154 Water Quality and Environmental Management for Corps Civil Works Projects RCS DAEN-CWH-4

Purpose: This regulation establishes a policy for the water quality management program at Corps civil works projects.

Article by

ER 1110-2-8153 Technical Project Sedimentation Investigations

Purpose: This regulation prescribes the procedure and rationale for conducting sedimentation investigations in support of the hydrologic analysis, hydraulic design of civil works projects, and environmental impact analyses. Guidance for performing sedimentation investigations is contained in references listed in paragraph …Read More

Article by
Master Army Promotions Boards - App for iOS
Company Command: The Bottom Line - Army Leadership Guide

ER 1110-2-8152 Planning and Design of Temporary Coffer Dams and Braced Excavation

Purpose: This regulation provides directives for procedures to be followed while planning and designing temporary construction for cofferdams and unwatered excavations on major civil works projects. The objective is to provide criteria and guidance for providing safe working conditions and …Read More

Article by

ER 1110-2-8151 Monitoring Coastal Projects

Purpose:  This engineer regulation (ER) states the objective, outlines the scope, discusses funding, assigns responsibility, and establishes the procedures by which the Corps of Engineers (CE) evaluates planning, design, construction, and operation and maintenance performance of civil works navigation projects.

Article by

ER 1110-2-500 EPA USACE Superfund Program Funding and Reporting Requirements

Purpose:  This regulation provides general policy and guidance for establishing procedures governing the funds management and reporting requirements for Interagency Agreements (IAAs) issued by the U.S. Environmental Protection Agency (EPA) to the U.S. Army Corps of Engineers (USACE) for the …Read More

Article by

ER 1110-2-50 Low Level Discharge Facilities for Drawdown of Impoundments

Purpose: This regulation states the policy, objectives, and procedures in regard to facilities for drawdown of lakes to be impounded by Civil Works projects.

Article by

ER 1110-2-4401 Clearances for Power and Communication Lines over Reservoirs

Purpose: This regulation defines the minimum vertical clearances to be provided when relocating or replacing existing or when constructing new power and communication lines over waters of reservoir projects. Definitions are provided in paragraph 5.

Article by

ER 1110-2-401 Operation, Maintenance, Repair, Replacement, and Rehabilitation Manual for Projects and Separable Elements Managed by Project Sponsors

Operation, Maintenance, Repair, Replacement, and Rehabilitation Manual for Projects and Separable Elements Managed by Project Sponsors Purpose: This regulation provides instructions for the preparation of operation and maintenance manuals outlining the responsibilities of those local sponsors that have entered into …Read More

Article by