Mark Dail | AskTOP.net – Leader Development for Army Professionals

Author Archive

Here is a list of every post written by Mark Dail

EM 1110-2-1009 Engineering and Design – Structural Deformation Surveying

Purpose: This manual provides technical guidance for performing precise structural deformation surveys of locks, dams, and other hydraulic flood control or navigation structures.  Accuracy, procedural, and quality control standards are defined for monitoring displacements in hydraulic structures. CLICK TO DOWNLOAD

Article by

EM 1110-1-502 Technical Guidelines for Hazardous and Toxic Wast Treatment and Cleanup Activities

Purpose: This manual provides design guidelines that will aid U.S. Army Corps of Engineers Districts and Divisions in the selection of remedial actions at uncontrolled hazardous waste sites. These guidelines are to be used in support of the Department of …Read More

Article by

EM 1110-1-4016 Engineering and Design – Landfill Off-Gas Collection and Treatment Systems

Purpose and Scope: This EM establishes criteria and guidance for landfill off-gas collection and treatment systems.

Article by
The comprehensive guide to the Military Decision Making Process (MDMP)
Company Command: The Bottom Line - Army Leadership Guide

EM 1110-1-4015 Errata Sheet 1

Errata Sheet No. 1 Engineering and Design IN-SITU THERMAL REMEDIATION EM 1110-1-4015 28 August 2009 Paragraph 10.2.1.2: The last four sentences of Paragraph 10.2.1.2 are hereby changed as contained in this Errata.

Article by

EM 1110-1-4012 Engineering and Design Precipitation Coagulation Flocculation

Purpose: Chemical precipitation is the most common technique used for treatment of metal-contaminated waters (Patterson and Minear 1975, EPA 625/8-80-003, EPA 600/8-80-042c, Peters et al. 1985, Patterson 1988). Chemical precipitation of heavy metals has long been used as the primary …Read More

Article by

EM 1110-1-4011 Construction Quality Assurance CQA Plan Requirements for Hazardous Waste Landfills

Purpose: This engineer manual transmits a document which describes CQA inspection requirements for hazardous waste landfill covers and liners. The appendix of this document is a template for landfill CQA plans to assist designers in incorporating the important aspects of …Read More

Article by
The comprehensive guide to the Military Decision Making Process (MDMP)
Wear it Right! Army Uniform Tool

EM 1110-1-4010 Multi-Phase Extraction

Purpose. This Engineer Manual (EM) is intended to provide detailed guidance on all phases of remediation projects involving Multi-phase Extraction (MPE). This includes guidance on (1) the appropriate site characterization and pilot studies for MPE; (2) appropriate considerations in screening …Read More

Article by

EM 1110-1-4009 Errata Sheet 4

ERRATA SHEET No. 3 Engineering and Design MILITARY MUNITIONS RESPONSE ACTIONS EM 1110-1-4009 15 June 2007 Pending the next update to EM 1110-1-4009, the included paragraphs in Chapter 7, Section 7-5a, sub-section are changed as indicated (underlined text is new …Read More

Article by

EM 1110-1-4009 Errata Sheet 3

ERRATA SHEET No. 3 Engineering and Design MILITARY MUNITIONS RESPONSE ACTIONS EM 1110-1-4009 15 June 2007 Pending the next update to EM 1110-1-4009, the included changes to the document are to be implemented.

Article by

EM 1110-1-4009 Errata Sheet 2

ERRATA SHEET No. 2 Engineering and Design MILITARY MUNITIONS RESPONSE ACTIONS EM 1110-1-4009 15 June 2007 Pending the next update to EM 1110-1-4009, paragraph 14-1(f) is added.

Article by

EM 1110-1-4009 Errata Sheet 1

ERRATA SHEET No. 1 Engineering and Design MILITARY MUNITIONS RESPONSE ACTIONS EM 1110-1-4009 15 June 2007 Pending the next update to EM 1110-1-4009, paragraph 11-7 is changed.

Article by

EM 1110-1-4009 Engineering and Design Military Munitions Response Actions

Purpose: This manual provides the U.S. Army Corps of Engineers (USACE) personnel with the procedures to be used to perform engineering and design activities for all phases of the Military Munitions Response Program (MMRP).

Article by