ER 5-1-11 U.S. Army Corps of Engineers Business Process

Purpose:  This regulation establishes policy and doctrine to accomplish all work performed by the U.S. Army Corps of Engineers (USACE). CLICK TO DOWNLOAD

Article by

ER 5-1-10 Corps-wide Area of Work Responsibility

Purpose:  This regulation establishes policy and procedures for the assignment of work within the U.S. Army Corps of Engineers (USACE).

Article by

ER 415-4-41 Work Authorization and Funds for Air Force and Air Force Military Construction

Purpose:  This regulation prescribes the procedures and responsibilities for funding and authorization of Air Force, Air Force Reserve and Air Force Family Housing military construction (MILCON) projects from design through construction.

Article by
Army Uniform Tool
Company Command: The Bottom Line - Army Leadership Guide

ER 415-345-38 Transfer and Warranties

Purpose:  This regulation prescribes U.S. Army Corps of Engineers (USACE) policy and procedures for the transfer of completed construction projects and for implementing warranties. Recommended changes to this regulation should be forwarded to CEMP-EC.

Article by

ER 415-345-13 Financial Closeout

Purpose:  This regulation establishes policy for financial closeout of projects after acceptance of military construction contracts.

Article by

ER 415-2-4 Corps Support for EPA Construction Grants Program

Purpose:  The purpose of this regulation is to set forth Headquarters, U.S. Army Corps of Engineers (HQUSACE) policies and procedures regarding the U.S. Army Corps of Engineers (Corps) mission in the U.S. Environmental Protection Agency (EPA) Construction Grants Program (CGP) …Read More

Article by
Army Counseling Software - Include over 250 Army Counseling Examples
The comprehensive guide to the Military Decision Making Process (MDMP)

ER 415-2-100 Staffing for Civil Works Projects

Purpose:  This regulation establishes and affirms policies and procedures governing construction staffing for Civil Works projects.

Article by

ER 415-1-16 Fiscal Management

Purpose:  This regulation establishes the policies and procedures to be used in the financial management of the construction function at the district/operating major subordinate command (MSC) level. It also establishes procedures for the management of the supervision and administration (S&A) …Read More

Article by

ER 415-1-15 Construction Time Extensions for Weather

Purpose:  To provide guidance for establishing contract time adjustments for delays resulting from unusually severe weather.

Article by

ER 415-1-13 Design and Construction Evaluation DCS CH 1

Purpose:  This regulation prescribes the administrative and technical evaluation and reporting system for the Military and Civil Works Construction Program.

Article by

ER 415-1-11 Biddability Constructibility Operability and Environmental Review

Purpose:  This regulation establishes a system to ensure that the biddability, constructibility, operability and environmental (BCOE) aspects of a project are considered during design and a high degree of BCOE review is integrated into the construction procurement documents for all …Read More

Article by

ER 415-1-10 Contractor Submittal Procedures CH 1

Purpose:  The purpose of this regulation is to establish a system whereby the contractor can maintain effective scheduling, control and processing of submittals required by the contract in order to regulate the timely flow of materials to be incorporated into …Read More