2011 | AskTOP.net – Leader Development for Army Professionals

Archive for 2011

ER 1110-2-1451 Acquisition of Lands Downstream from Spillways for Hydrologic Safety PurposesER 1110-2-1451 Acquisition of Lands Downstream from Spillways for Hydrologic Safety Purposes

Purpose: This regulation provides guidance on the acquisition of lands downstream from spillways for the purpose of protecting the public from hazards imposed by spillway discharges. Guidance contained herein is in addition to ER 405-2-150. CLICK TO DOWNLOAD

Article by

ER 1110-2-1450 Hydrologic Frequency Estimates

Purpose: This regulation defines the scope of analysis, reporting, and coordination requirements for determining frequency estimates of hydrologic variables.

Article by

ER 1110-2-1407 Hydraulic Design for Coastal Shore Protection Projects

Purpose: This regulation defines the hydraulic design engineer’s responsibilities for initial design of coastal shore protection projects, for engineering inspection and evaluation during the construction and subsequent operation of such projects, and for the nourishment of coastal storm damage reduction …Read More

Article by
Get Tabbed - How to Graduated Army Ranger School
Army Counseling Software - Include over 250 Army Counseling Examples

ER 1110-2-1406 Coastal Field Data Collection

Purpose: This regulation describes the Coastal Field Data Collection (CFDC) Program and establishes the procedures by which the U. S. Army Corps of Engineers gathers, archives, and disseminates coastal field data.

Article by

ER 1110-2-1405 Hydraulic Design for Local Flood Protection Projects

Purpose: This regulation prescribes the design procedure and rationale for the hydraulic design of a local flood protection channel project. Design guidance is contained in the reference listed in paragraph 3 and recognized engineering texts.

Article by

ER 1110-2-1404 Hydraulic Design of Deep-Draft Navigation Projects

Purpose: This regulation prescribes the design procedure and rationale for the hydraulic design of deep-draft navigation projects.

Article by
Visit MentorMilitary.com
The Board Master - Army Promotion Board Study Guide

ER 1110-2-1403 Studies by Coastal Hydraulic and Hydrologic Facilities and Others

Purpose: This regulation prescribes policy and procedures for approval and technical supervision of coastal, hydraulic, and hydrologic studies related to planning, design, construction, and operation of U.S. Army Corps of Engineers (USACE) civil works projects.

Article by

ER 1110-2-1400 Reservoir Water Control Centers

Purpose: This regulation provides for the establishment of Reservoir/ Water Control Centers (Centers) in the major subordinate commands (MSC), summarizes basic activities of the Centers, and describes the delegated responsibilities to the Centers for management activities.

Article by

ER 1110-2-1302 Civil Works Cost Engineering ENG 1738-R ENG 1739-R, ENG 1740-R ENG 1741-R ENG 1741A-R ENG 1741B ENG 1741C-R

Purpose: This engineer regulation (ER) provides policy, guidance, and procedures for cost engineering responsibilities for all civil works (CW) projects assigned to the U.S. Army Corps of Engineers (USACE).

Article by

ER 1110-2-1156 Engineering and Design Safety of Dams – Policy and Procedures

Purpose: This regulation prescribes the guiding principles, policy, organization, responsibilities, and procedures for implementation of risk-informed dam safety program activities and a dam safety portfolio risk management process within the United States Army, Corps of Engineers (USACE). Risk is defined …Read More

Article by

ER 1110-2-1155 Dam Safety Assurance Program

Purpose: This regulation provides guidance and procedures for the investigation and justification of modifications for dam safety assurance at completed Corps of Engineers projects, under the authority of Section 1203 of the Water Resources Development Act of 1986 (P.L.99-662).

Article by

ER 1110-2-1150 Engineering and Design for Civil Works Projects

Purpose: This regulation defines engineering responsibilities, requirements, and procedures during the planning, design, construction, and operations phases of civil works projects. The regulation provides guidance for developing and documenting quality engineering analyses and designs for projects and products on time …Read More

Article by